Mosquito Net Manufacturing Research
Project details
I need help doing preliminary research on manufacturing mosquito nets. I would like to set up manufacturing for mosquito nets in Africa, which presents challenges for operating machinery. I need a researcher who has some understanding of textiles and manufacturing methods to answer the following questions: -How are mosquito nets made? -What equipment is used for this: (a) electrically powered equipment, and (b) manually operated equipment? -How much does this equipment cost? -How is this equipment obtained? -How big is it, how much does it weigh? -How many workers are required? -What are the raw materials required? -How much do these materials cost? -Where are these materials obtained? -Are there materials in Africa or even the African savannah, locally available, which can be obtained? The end product requested from the researcher is a document that answers these questions and provides information on suppliers and prices, with hyperlinks and other supporting information or documents, such that I have a good preliminary assessment of the work involved to set this up.
## Deliverables
1) Complete and fully-functional working program(s) in executable form as well as complete source code of all work done.
2) Deliverables must be in ready-to-run condition, as follows? (depending on the nature? of the deliverables):
a)? For web sites or? other server-side deliverables intended to only ever exist in one place in the Buyer’s environment–Deliverables must be installed by the Seller in ready-to-run condition in the Buyer’s environment.
b) For all others including desktop software or software the buyer intends to distribute: A software? installation package that will install the software in ready-to-run condition on the platform(s) specified in this bid request.
3) All deliverables will be considered “work made for hire” under U.S. Copyright law. Buyer will receive exclusive and complete copyrights to all work purchased. (No GPL, GNU, 3rd party components, etc. unless all copyright ramifications are explained AND AGREED TO by the buyer on the site per the coder’s Seller Legal Agreement).
## Platform
MS Word
Awarded to:

Gurpreet S.
(4.8)
Awarded to:

Gurpreet S.
(4.8)
Project details
## Deliverables
1) Complete and fully-functional working program(s) in executable form as well as complete source code of all work done.
2) Deliverables must be in ready-to-run condition, as follows? (depending on the nature? of the deliverables):
a)? For web sites or? other server-side deliverables intended to only ever exist in one place in the Buyer’s environment–Deliverables must be installed by the Seller in ready-to-run condition in the Buyer’s environment.
b) For all others including desktop software or software the buyer intends to distribute: A software? installation package that will install the software in ready-to-run condition on the platform(s) specified in this bid request.
3) All deliverables will be considered “work made for hire” under U.S. Copyright law. Buyer will receive exclusive and complete copyrights to all work purchased. (No GPL, GNU, 3rd party components, etc. unless all copyright ramifications are explained AND AGREED TO by the buyer on the site per the coder’s Seller Legal Agreement).
## Platform
MS Word
Some Gurpreet S. projects
Project Title | Skills required in the project |
---|---|
UK Basic Business Law assignment | Article Rewriting Copywriting Engineering MySQL Odd Jobs PHP Research Writing Software Architecture Software Testing Technical Writing Translation |
Mosquito Net Manufacturing Research | Article Rewriting Copywriting Research Writing Technical Writing |
HTML based user manual | PHP |
week2 #2 | Technical Writing |
wireless summary | Technical Writing |